WARRINGTON-based Interior Door Systems (IDS) has announced the completion of a £350,000 factory refurbishment.
The upgrade at its Hardwick Grange base has effectively increased the company’s output capacity tenfold while supporting environmental responsibility.
The state-of-the-art refurbishment incorporates cutting-edge technology and sustainable practices to redefine production standards.
Key advancements include:
• Next-Generation CNC and Drilling Machinery: Precision-engineered equipment that advances the manufacturing of hinged and sliding doors, as well as full carcass interior systems.
• Eco-Friendly Multi-Fuel Energy System: A sustainable energy solution repurposing production waste to power operations, significantly reducing dependence on conventional energy sources.
• Community Support through Waste Repurposing: Excess waste materials are donated to a local school’s woodwork department, fostering educational growth and sustainability.
• Enhanced Edge Bander Technology: Upgraded from 4 to 27 meters per minute, this innovation boosts efficiency and quality while minimising glue usage, cutting down waste and improving finishes.
• High-Performance Dust Extraction System: A self-cleaning, full-grade solution ensuring a safer, cleaner work environment and efficient dust management.
• In-House Steel Mill: A unique, strategic addition that ensures streamlined processes and consistent
quality, reinforcing the company’s dedication to “Made in Britain” craftsmanship.
Managing director Sam Russell said: “This refurbishment is a defining moment for our company. By radically improving our manufacturing capabilities, we’re increasing output and reaffirming our commitment to sustainability and innovation. These upgrades enable us to deliver unparalleled value and service to our customers, raising the bar for quality and environmental responsibility in the KBB market.”
Visit www.interiordoorsystem