A TRAFFIC ban is to be introduced off Wilderspool Causeway, Warrington to enable a new drainage system to be installed.
The prohibition of driving will come into forced on April 1 for a period of up to 12 weeks, when signs are displayed on the site and will affect a passageway at the rear of houses on the Causeway.
Access will be under the control of the relevant contractor for the duration of the works.
The closure is required to allow for Cruden Construction to install a drainage system associated with a new development on Loushers Lane.
12-week traffic ban
00 Comments
Share.