4
MP secures timetable of works for painting and maintaining eyesore swing bridges
WORK looks set to at long last start on painting and repairing Warrington’s three eyesore swing bridges – with the first one timetabled for next summer, says Warrington South MP Faisal Rashid.
Read More
