Giant funnel bins to tackle motorway litter

1

GIANT funnel bins are being fitted at motorway service areas across the North West in a bid to decrease the amount of litter dropped on the region’s roads.

Highways England is providing the bins as part of a North West initiative to tackle littering after over 40,000 sacks of rubbish had to be collected from motorways in the region last year – an average of 108 sacks for every mile of motorway.

The window-height bins are being installed at around a dozen service areas in the North West over the next few months, and the first bins have been installed at Lymm Services by the M6 in Cheshire this week.

Two different sizes of bins are being installed – ranging from 1.8 to 2.2 metres high – next to Give Way lines at the exit to service area car parks. The bins allow both car and lorry drivers to reach the half-a-metre-wide funnels from their vehicles’ windows.

Paul Elliott, Service Delivery Team Leader at Highways England, said: “We’re committed to tackling littering on our network and are installing the funnel bins at service areas in the North West. The bins offer another opportunity for road users to dispose of their rubbish responsibly within service areas.

“Our teams of workers do a fantastic job removing litter from motorways every year but we’d much rather they were able to spend more of their time carrying out maintenance work.

“The new giant funnel bins will make it much easier for drivers to get rid of their litter as they won’t need to leave their vehicles, and I’d urge drivers to either use the bins on the network or to take their litter home with them.”

It costs taxpayers an estimated £40 for each sack of litter collected from motorways – roughly the same cost as fixing a pothole.

Litter poses a risk to other drivers if it lands on windscreens, causes danger to wildlife and leads to flooding if drains become blocked so litter picking is regularly carried out across the network.

Rubbish has to be collected close to fast-moving traffic – putting workers at risk – and lane closures are often needed, causing unnecessary disruption to drivers.

 


1 Comments
Share.

About Author

1 Comment

  1. I was going to say that i would give them a week before they had a problem with them. Even that has proved optimistic as three of the ones put in have been damaged in just 24 hours by lorries.

Leave A Comment